Phase 1 · China Import and Export Fair Complex
2026.10.15 — 19
China · Venue local dates · China Standard Time
Opening dates are separate from cargo receiving and move-out windows.
Plan logistics for this occurrence ↗
Home中文Plan your logistics Service arrangements to be confirmed
Confirm the venue, stand and receiving window before arranging freight. This edition has separate phases at the same venue. Dates between phases are not exhibition opening days.
2026.10.15 — 19
China · Venue local dates · China Standard Time
Opening dates are separate from cargo receiving and move-out windows.
Plan logistics for this occurrence ↗2026.10.23 — 27
China · Venue local dates · China Standard Time
Opening dates are separate from cargo receiving and move-out windows.
Plan logistics for this occurrence ↗2026.10.31 — 2026.11.04
China · Venue local dates · China Standard Time
Opening dates are separate from cargo receiving and move-out windows.
Plan logistics for this occurrence ↗Prices, timing and appointments depend on the confirmed conditions. Basic exhibition information is maintained separately from detailed guides and special rules.
Get an exhibition logistics plan ↗No. Confirm official receiving, build-up, vehicle access, unloading and move-out arrangements separately. Exhibition opening dates alone do not establish these windows.
No. This page provides basic reference information. Perlon service availability and on-site permissions for the particular edition must be confirmed.
Some official proper names may remain in the source language until a verified English name is available.
Plan packing, handling, handovers and coverage, including storage and return transport.